Causes of August 14th Blackout
Control Implications of August 14th
Early Power System Control (in 1919)
Late 1990’s Control Centers (ComED)
Control Center Trend Towards Overview Displays (ComED Now)
Overview of Real-time Power System Operations
Overview of Real-time Power System Operations
Power Transfer Distribution Factors (PTDFs)
PTDF Visualization of a Power Transaction from Wisconsin to TVA
Line Outage Distribution Factors (LODFs)
Flows in Northeast Ohio at
15:00 EDT on August 14th 2003
Northeast Ohio 138 kV Voltage Contour: 15:00 EDT
Flows in Northeast Ohio at
15:33 EDT on August 14th 2003
Northeast Ohio 138 kV Voltage Contour: 15:33 EDT
Flows in Northeast Ohio at
15:46 EDT on August 14th 2003
Northeast Ohio 138 kV Voltage Contour: 15:46 EDT
Flows in Northeast Ohio at
16:05 EDT on August 14th 2003
Northeast Ohio 138 kV Voltage Contour: 16:05 EDT
Are DC LODFs
Accurate?
August 14th Crash Test
The Results are Actually Quite Good!
What was missing on August 14th?
System with Dynamic Sized Pie Charts used to Indicate Loading
Continuous Contour of Bus LMPs
3D View of Generation Sources in Midwest
Visualization of Contingency Analysis Results
Single Device Contingencies: Contingency to Violated Elements
Single Device Contingencies: Violated Element to Contingencies